Wire up a Kontrol duplex lift-station panel end to end: lock it out, land the incoming power, set four floats in the wet well, land them on the strip, prove the pumps alternate, and test the high-level alarm.
Six stages, start to finish. Every wrong terminal, every float out of order and every step taken out of sequence gets counted — the same way it would get counted on a startup report.
Drag a wire, or tap it and then tap where it goes — both work, on desktop or phone.
1 Lock out
2 Incoming power
3 Float setting
4 Float wiring
5 Alternation
6 Alarm circuit
Before you begin
STAGE 1 OF 6
LOCK OUT
1
Step 1
—
—
MISSTEPS THIS STAGE: 0
Stage complete
—
RHINO PUMPS · DUPLEX WIRING SIMULATOR
STARTUP COMPLETE
Station Commissioned.
Panel locked out, powered, floats set and wired, alternation proven and the alarm circuit tested.